
Hardware options installation 40
5.
Align the rear screw holes of the RJ-45 port bracket to the middle frame, and then install the screws
according to the numbering indicated on the bracket.
6.
Install the communication board screws.
Prepare the server for setup
1.
Install the access panel (on page
2.
If the server was removed from the cradle, wall mount, or storage expansion unit, do one of the
following:
o
Install the server in the cradle (on page
o
Install the server in the wall mount (on page
o
Install the server on the storage expansion unit (on page
Servers attached to storage expansion units must be positioned adjacent to each other, and not
on top of each other.
3.
If removed, install the Kensington security lock.
For more information, see the Kensington security lock documentation.
Summary of Contents for ProLiant EC200a
Page 13: ...Component identification 13 Fan location in the storage expansion unit ...
Page 43: ...Cabling 43 Fan cabling Ambient temperature sensor cabling ...
Page 65: ...Support and other resources 65 ...
Page 66: ...Support and other resources 66 ...