Hardware options installation 76
If you do not have a full-length expansion board, the air baffle can be installed last.
20.
Connect the other end of the SAS signal cables to the SAS controller board and to the system board.
Then, install the PCI riser cage.
SAS cables can be connected to the PCI riser cage and the system board before or after the PCI riser
cage is installed. For ease of accessing connectors, HP recommends connecting the cables before the
PCI riser cage is installed.
Summary of Contents for ProLiant DL388p
Page 44: ...Hardware options installation 44 14 Install the heatsink 15 Remove the two fan blanks ...
Page 83: ...Cabling 83 LFF hard drive cabling Optical drive cabling ...
Page 84: ...Cabling 84 FBWC cabling 8 or 16 drive SFF 8 drive LFF PCIe option ...
Page 120: ...Technical support 120 ...
Page 121: ...Technical support 121 ...