Hardware options installation 52
7.
Install the DIMM.
8.
Install the access panel (on page
9.
Install the server into the rack ("
Installing the server into the rack
" on page
10.
Connect each power cord to the server.
11.
Connect each power cord to the power source.
12.
Use RBSU ("
" on page
) to configure the memory mode.
For more information about LEDs and troubleshooting failed DIMMs, see "Systems Insight Display LED
combinations (on page
)."
Hot-plug hard drive options
When adding hard drives to the server, observe the following general guidelines:
•
The system automatically sets all device numbers.
•
If only one hard drive is used, install it in the bay with the lowest device number.
•
Drives should be the same capacity to provide the greatest storage space efficiency when drives are
grouped together into the same drive array.
Installing a hot-plug SAS or SATA hard drive
The server can support 8 SAS or SATA hard drives in a SFF or LFF configuration, or 16 drives in a SFF
configuration with the optional hard drive cage ("
" on page
To install the component:
Summary of Contents for ProLiant DL388p
Page 44: ...Hardware options installation 44 14 Install the heatsink 15 Remove the two fan blanks ...
Page 83: ...Cabling 83 LFF hard drive cabling Optical drive cabling ...
Page 84: ...Cabling 84 FBWC cabling 8 or 16 drive SFF 8 drive LFF PCIe option ...
Page 120: ...Technical support 120 ...
Page 121: ...Technical support 121 ...