
Hardware options installation 66
13.
Connect each power cord to the power source.
14.
Secondary PCI riser cage option
WARNING:
To reduce the risk of personal injury, electric shock, or damage to the equipment,
remove the power cord to remove power from the server. The front panel Power On/Standby
button does not completely shut off system power. Portions of the power supply and some internal
circuitry remain active until AC power is removed.
CAUTION:
To prevent improper cooling and thermal damage, do not operate the server unless
all PCI slots have either an expansion slot cover or an expansion board installed.
IMPORTANT:
The secondary PCI riser cage option requires both processors.
To install the component:
1.
Power down the server (on page
2.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Extend the server from the rack (on page
4.
Remove the access panel (on page
5.
Remove the PCI riser blank.
Summary of Contents for ProLiant DL388p
Page 44: ...Hardware options installation 44 14 Install the heatsink 15 Remove the two fan blanks ...
Page 83: ...Cabling 83 LFF hard drive cabling Optical drive cabling ...
Page 84: ...Cabling 84 FBWC cabling 8 or 16 drive SFF 8 drive LFF PCIe option ...
Page 120: ...Technical support 120 ...
Page 121: ...Technical support 121 ...