![HP ProLiant DL388 User Manual Download Page 57](http://html.mh-extra.com/html/hp/proliant-dl388/proliant-dl388_user-manual_164768057.webp)
Hardware options installation 57
10.
Attach the capacitor pack to the air baffle.
11.
Install the PCI riser cage (on page
29
).
12.
Install the full-length expansion board retainer (on page
30
) if any full-length expansion boards are
installed.
13.
Install the access panel (on page
26
).
14.
Install the server into the rack ("
Installing the server into the rack
" on page
35
).
15.
Power up the server (on page
24
).
Optical drive option
1.
Power down the server (on page
24
).
2.
Extend the server from the rack (on page
24
).
3.
Remove the access panel (on page
25
).
Summary of Contents for ProLiant DL388
Page 44: ...Hardware options installation 44 13 Install the heatsink ...
Page 69: ...Cabling 69 Cabling SAS hard drive cabling Optical drive cabling ...
Page 70: ...Cabling 70 BBWC battery cabling FBWC battery cabling ...
Page 119: ...Technical support 119 ...
Page 120: ...Technical support 120 ...
Page 127: ...Index 127 video connector 7 W warnings 35 85 website HP 113 ...