Operations 26
1.
Power down the server if performing a non-hot-plug installation or maintenance procedure ("
Power
down the server
" on page
24
).
2.
Extend the server from the rack (on page
24
).
3.
Use the T-15 Torx screwdriver attached to the rear of the server to loosen the security screw on the hood
latch.
4.
Lift up on the hood latch handle, and then remove the access panel.
Install the access panel
1.
Place the access panel on top of the server with the hood latch open. Allow the panel to extend past the
rear of the server approximately 1.25 cm (0.5 in).
2.
Push down on the hood latch. The access panel slides to a closed position.
3.
Use the T-15 Torx screwdriver attached to the rear of the server to tighten the security screw on the hood
latch.
Access the product rear panel
Cable management arm with left-hand swing
To access the server rear panel:
1.
Remove the cable arm retainer.
Summary of Contents for ProLiant DL388
Page 44: ...Hardware options installation 44 13 Install the heatsink ...
Page 69: ...Cabling 69 Cabling SAS hard drive cabling Optical drive cabling ...
Page 70: ...Cabling 70 BBWC battery cabling FBWC battery cabling ...
Page 119: ...Technical support 119 ...
Page 120: ...Technical support 120 ...
Page 127: ...Index 127 video connector 7 W warnings 35 85 website HP 113 ...