Operations 26
2.
Open the cable management arm. Note that the cable management arm can be right-mounted or
left-mounted.
Remove the hot-plug fan cage
To remove the component:
1.
Power down the server (on page
23
).
2.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Extend ("
Extend the server from the rack
" on page
23
) or remove the server from the rack.
4.
Remove the access panel (on page
24
).
5.
Remove the air baffle (on page
32
).
Summary of Contents for ProLiant DL380p
Page 6: ...Contents 6 Acronyms and abbreviations 128 Documentation feedback 131 Index 132 ...
Page 47: ...Hardware options installation 47 14 Install the heatsink 15 Remove the two fan blanks ...
Page 61: ...Hardware options installation 61 o 8 or 16 drive SFF o 8 drive LFF ...
Page 91: ...Cabling 91 LFF hard drive cabling Optical drive cabling ...
Page 92: ...Cabling 92 FBWC cabling 8 or 16 drive SFF 8 drive LFF ...
Page 97: ...Cabling 97 Connect the cable as indicated ...
Page 126: ...Support and other resources 126 ...
Page 127: ...Support and other resources 127 ...