Hardware options installation 63
b.
Install the FBWC capacitor pack holder into the server.
11.
Install the access panel (on page
25
).
12.
Install the server into the rack ("
Installing the server into the rack
" on page
38
).
13.
Connect each power cord to the server.
14.
Connect each power cord to the power source.
15.
Power up the server (on page
23
).
Optical drive option
1.
Power down the server (on page
23
).
2.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Extend the server from the rack (on page
23
).
4.
Remove the access panel (on page
24
).
Summary of Contents for ProLiant DL380p
Page 6: ...Contents 6 Acronyms and abbreviations 128 Documentation feedback 131 Index 132 ...
Page 47: ...Hardware options installation 47 14 Install the heatsink 15 Remove the two fan blanks ...
Page 61: ...Hardware options installation 61 o 8 or 16 drive SFF o 8 drive LFF ...
Page 91: ...Cabling 91 LFF hard drive cabling Optical drive cabling ...
Page 92: ...Cabling 92 FBWC cabling 8 or 16 drive SFF 8 drive LFF ...
Page 97: ...Cabling 97 Connect the cable as indicated ...
Page 126: ...Support and other resources 126 ...