4-5
Replacing Components
Replacing the Management Module
Replacing Components
Replacing the Management Module
The switch does not have to be powered off to remove the management
module, however when the management module is removed all ports will lose
communication. HP networking recommends replacing all components
during scheduled down time.
To install (or replace) a Management Module:
1.
On the module unscrew the retaining screws enough to disconnect them
from the threaded holes in the switch.
2.
Using the extractor handles, pull the module out from the slot.
3.
Remove the flash disk from the failed module and install it into the
replacement module.
4.
Remove the battery from the failed module and dispose of properly.
5.
Install the new battery that came with the replacement module. See
“Installing a Management Module Battery” on page 2-8
for instructions.
6.
Install the replacement module into the switch.
7.
Use an equal amount of pressure and push both extractor handles closed
to completely seat the module.
8.
Tighten the retaining screws.
Retaining Screws
Extractor Handles
Figure 4-4. Management Module removal and installation
Summary of Contents for ProCurve 5400zl Series
Page 1: ...HP 5400 zl Switches Installation and Getting Started Guide Power over Ethernet ...
Page 2: ......
Page 3: ...HP 5400 zl Switches Installation and Getting Started Guide ...
Page 10: ......
Page 60: ......
Page 93: ...5 15 Troubleshooting HP Customer Support Services Troubleshooting ...
Page 94: ...5 16 Troubleshooting HP Customer Support Services Troubleshooting ...
Page 110: ......
Page 134: ......