and debris should be removed from the under the floor area to avoid becoming dust/dirt traps or
potential sources of rust.
During major changes in the server room environment, special considerations must be taken into
account whenever any drilling, sawing, welding, brazing, etc., is performed.
Precautions must be taken to prevent material particles (concrete or metal particles, etc.) from
becoming airborne. Storage systems should be powered down during construction that requires
any drilling, sawing, welding, brazing, etc. In addition, all debris must be removed before powering
up the system(s). Maximum concentrations of corrosive gases and solvent vapors must also be
considered.
28
Structural/Environmental Considerations
Summary of Contents for P10000
Page 30: ...Figure 12 Power Supplies Within the Power Domains 30 Power Requirements ...
Page 59: ...French battery notice German battery notice Battery replacement notices 59 ...
Page 60: ...Italian battery notice Japanese battery notice 60 Regulatory compliance notices ...
Page 61: ...Spanish battery notice Battery replacement notices 61 ...