Chapter 2
Installing the Server
Cabling and Power Up
85
On the front of the server, a solid green Power LED and a solid green MP Status LED will illuminate after
about 30 seconds. Refer to Figure 2-29.
Figure 2-29
Front Panel Display
2. Check the bulk power supply LED for each BPS.
When on, the breakers distribute power to the BPSs. AC power is present at the BPSs:
•
When power is first applied. The BPS LEDs will be flashing amber.
•
After 30 seconds has elapsed. The flashing amber BPS LED for each BPS becomes a flashing green
LED.
Refer to power cord policies to interpret LED indicators.
3. Log in to the MP:
a.
Enter
Admin
at the login prompt. The login is case sensitive.
It takes a few moments for the MP prompt to display. If it does not, be sure the laptop serial device
settings are correct: 8 bits, no parity, 9600 baud, and na for both Receive and Transmit. Then, try
again.
b.
Enter
Admin
at the password prompt. The password is case sensitive.
Summary of Contents for Integrity rx7640
Page 4: ...Contents 4 ...
Page 5: ...Contents 5 ...
Page 6: ...Contents 6 ...
Page 7: ...Contents 7 ...
Page 8: ...Contents 8 ...
Page 10: ...Tables 10 ...
Page 13: ...Figures 13 ...
Page 14: ...Figures 14 ...
Page 101: ...Index 101 ...