Rack options 9
2.
Install one cage nut into the top hole of U4 and the middle hole of U9 (U15 and U20) in the front
mounting rails.
Installing the cable management system
NOTE:
The U locations are noted in the following procedure for enclosures installed in the
lower portion of the rack. When installing multiple enclosures into the rack, use the U
locations in parentheses for the top enclosure.
1.
Install one cage nut into the bottom holes of U5 or U9 (U16 and U20) in the rear mounting rails.
Summary of Contents for Integrity BL870c
Page 29: ...Enclosure options 29 ...