Standard Operation Procedure
Document No.
Nantucket bezel Air bonding DIS SOP
Station
:
Name
: Ver. :
Date
:
Step
:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator
:
Issue department
:
Uen-Tung
NPSU-PPE
Auditor
:
Uen-Tung
8(1/1)
1. Disassemble LCM Mylar
Disassemble Mylar
2017/6/5
1.0
Fig.1
Fig.2