
Standard Operation Procedure
Document No.
Nantucket
FA DIS ASS’Y SOP
Station
:
Name
: Ver. :
Date
:
Step
:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator
:
Issue department
:
Uen-tung
NPSU-PPE
Auditor
:
Uen-tung
11(2/2)
1. Loosen screw *1
2. Disassemble SSD
Disassemble SSD
1
1.0
2017/6/13
Fig.1