
Standard Operation Procedure
Document No.
Nantucket bezel Air bonding DIS SOP
Station
:
Name
: Ver. :
Date
:
Step
:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator
:
Issue department
:
Uen-Tung
NPSU-PPE
Auditor
:
Uen-Tung
1.0
1. Loosen screw*4
2. Disassemble LCD
Disassemble LCD
2017/6/5
11(1/1)
1
4
2
3