
vi
cc2300 Carrier Grade Server Product Guide
Figures
Figure 1. cc2300 Carrier Grade Server Chassis........................................................................13
Figure 2. Front Panel Control Locations ....................................................................................16
Figure 3. DC Input Back Panel (AC Input Power Supply Shown Below) ...................................18
Figure 4. Server Board Connector and Component Locations ..................................................19
Figure 5. 3.3 Volt Riser Board with Half-height Bracket.............................................................29
Figure 6. 3.3 Volt Riser Board with Full-height Bracket .............................................................29
Figure 7. 5 Volt Riser Board with Full-height Bracket ................................................................30
Figure 8. DC-Power Supply Subsystem ....................................................................................31
Figure 9. AC-Power Supply Subsystem.....................................................................................34
Figure 10. Fan Module...............................................................................................................36
Figure 11. Tools and Supplies Needed......................................................................................63
Figure 12. Removing the Top Cover and Bezel Assembly ........................................................66
Figure 13. Internal Chassis Layout ............................................................................................67
Figure 14. Power Supply Module Replacement.........................................................................68
Figure 15. Fan Module Replacement.........................................................................................69
Figure 16. Removing a Hard Disk Drive ....................................................................................70
Figure 17. Installing DIMMs .......................................................................................................73
Figure 18. Raising the Locking Bar and Removing the Terminator ...........................................75
Figure 19. Inserting the Processor and Lowering the Locking Bar ............................................76
Figure 20. Aligning the Heatsink and Installing the Heatsink Retaining Clip .............................77
Figure 21. Unlatching the Heatsink Retaining Clip (Shown from Power Supply Side)...............78
Figure 22. Raising the Locking Bar on the Processor Socket....................................................78
Figure 23. Installing a Terminator ..............................................................................................79
Figure 24. Removing the CD-ROM Drive from the Carrier ........................................................86
Figure 25. Replacing the Backup Battery ..................................................................................87
Figure 28. Front Panel Board Removal .....................................................................................90
Figure 29. Front Panel Serial Port Connector............................................................................93
Figure 30. 15-pin Alarms Connector ..........................................................................................94
Figure 31. DC Power Input Connector.......................................................................................95
Figure 32. DC Power Terminal Lug ...........................................................................................95
Summary of Contents for cc2300
Page 1: ...Hewlett Packard cc2300 Carrier Grade Server Product Guide Document Release Date March 2003 ...
Page 12: ......
Page 38: ......
Page 40: ......
Page 60: ......
Page 88: ......
Page 90: ...90 cc2300 Carrier Grade Server Product Guide Figure 26 Front Panel Board Removal ...
Page 106: ......
Page 118: ......
Page 130: ...130 cc2300 Carrier Grade Server Product Guide ...