
A3
Source
Assembly
T
ools
Required
T-15
TORX
screwdriver
5/16-inc
h
op en-end
torque
wrenc
h
(set
to
10
in-lb)
ESD
(electrostatic
disc
harge)
grounding
wrist
strap
Remo
v
al
1.
Disconnect
the
p o
w
er
cord
and
remov
e
the
top
co
v
er
(refer
to
\Cov
ers"
in
this
c
hapter).
2.
Remo
v
e
the
source
brac
k
et
(item
1).
3.
Disconnect
the
semi-rigid
cable
(W1)
from
the
source
assem
bly
(A3).
If
y
ou
ha
v
e
Option
006,
remov
e
the
exible
cable
(W26)
from
the
source
as
w
ell.
4.
Lift
the
t
w
o
reten
tion
clips
(item
2)
at
the
fron
t
and
rear
of
the
source
assem
bly
(A3)
to
an
uprigh
t
p osition.
5.
The
source
is
seated
in
a
motherb oard
edge
connector.
Hold
the
lo
ose
semi-rigid
cable
(W1)
to
the
right
and
lift
up
on
the
source
brac
k
et
handle
(item
3)
to
remov
e
the
source
assem
bly
from
the
instrumen
t.
Replacement
1.
Slide
the
edges
of
the
sheet
metal
partition
(item
4)
in
to
the
guides
at
the
fron
t
and
bac
k
of
the
source
compartment.
Press
do
wn
on
the
mo
dule
to
ensure
that
it
is
w
ell
seated
in
the
motherb oard
connector.
2.
Push
do
wn
the
reten
tion
clips.
Reconnect
the
semi-rigid
cable
(W1)
to
the
source
assem
bly
.
If
y
ou
ha
v
e
Option
006,
reconnect
the
exible
cable
(W26)
to
the
source
as
w
ell.
Note
When
reconnecting
semi-rigid
cables,
it
is
recommended
that
the
connections
b e
torqued
to
10
in-lb.
14-24
Assembly
Replacement
and
P
ost-Repair
Procedures
DRAFT
3/21/106
15:15
Artisan Scientific - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisan-scientific.com