64
planning IRF cabling scheme,
topology (IRF fabric),
troubleshooting
built-in power supply failure,
configuration terminal problems,
garbled terminal display,
hot-swappable power supply failure,
power supply failure,
switch,
V
verifying
IRF fabric setup,
switch installation (19-inch rack),
VT100,
W
workbench
mounting switch,