21
If you cannot insert the plug into the receptacle, re-orient the plug rather than use excessive force
to push it in.
2.
Tighten the screws on the plug with a flat-blade screwdriver to secure the plug in the RPS receptacle.
See callout 2 in
3.
Connect the other end of the power cord to the RPS.
Figure 25
Connecting an RPS cord to an HP 5130-48G-4SFP+ EI switch
Verifying the installation
After you complete the installation, verify that:
•
There is enough space for heat dissipation around the switch, and the rack or workbench is stable.
•
The grounding cable is securely connected.
•
The correct power source is used.
•
The power cords are correctly connected.
•
All the interface cables are cabled indoors. If any cable is routed outdoors, verify that the socket
strip with lightning protection and lightning arresters for network ports have been correctly
connected.