
Working Parameters Display
Operation and Setup
Regenerative Discharge
Regenerative Discharge status : Simple Operation
1. Connect the battery ,which is going to receive power ,to the input e
nds of the charger
and wait for the system to comp
lete the self-checking . Connect the discharge battery
to the output ends of the charger in the standby interface ;
2. In the standby state , short press the speed shuttle key to pop up the “Task Settings"
menu, set t
he task to “Regenerative Discharge" ; adjust the task parameters, short
press the speed shuttle key to start the task ;
Scroll the speed shuttle key during operation can switch the display information in the lower half of the screen, which
are cell voltage and the operating data ; the cell voltage can only be displayed in the mode of balance charging.
3. When the task of Regenerative Discharge
is executing, short press the speed shuttle key
can pop up the "Adjust Task” menu to adjust the Regenerative Discharge current ;
long press the CH key can stop the curren
t task ;
4. Enjoy.
-3
mAh
23.46
V
Regenerative Discharge...
CH1
00:00:06
3.898V
3.897V
1
4
3.900V
3.905V
2
5
3.903V
3.893V
3
6
-3.1
W
-71
A
LiPo-6S(3.60V) 56%
2
16
P6 Smart Charger
Total Battery
Voltage
Task Status
Output
Current
Capacity
charged
Cell Voltage
Output Power
Operation Time
Battery parameters and
percentage completed
Current Channel