
11
POWER ON
Board Self Check
Display reads "r_##"
(## is board revision)
1. Frame heaters on
. Evaporator fan on
2.5 minute delay
1. Compressor start-up
. Condenser fan start-up
Cycle Off
(Cut-out
temperature reached)
[Minimum .5 minutes]
1. Compressor off
. Condenser fan off
Cycle On
(Cut-on
temperature reached)
[Minimum .5 minutes]
1. Compressor on
. Condenser fan on
If evaporator temperature
reaches 13°F (8°F for Pass Thru),
unit initiates defrost.
1. Compressor off
(Note: Condenser fan and
evaporator fan are on.)
Evaporator temperature
reaches 40°F, defrost
terminated
1. Compressor on
. Condenser fan on
Normal cycling continues
Note: The start circuit of the compressor is timed such that at power-up and during
any compressor off time, there will be at least a 1/ minute delay before the
compressor will start. The only exception is when the overload activates and
deactivates. The compressor has a 1/ minute minimum run time during every
run cycle.
II. General Information
A. Sequence of Operation and Timing Charts
1. Refrigerator and Refrigerator Side of Dual Temp Models
a) Sequence of Operation
Summary of Contents for TempGuard FH1-SSB
Page 7: ... 2 RH1 SSB HD FH1 SSB HD RFH1 SSB HD RH1 SSB GD mm in ...
Page 8: ... 3 RH2 SSB HD FH2 SSB HD RFH2 SSB HD RH2 SSB GD mm in ...
Page 9: ... 4 RH3 SSB HD FH3 SSB HD RFH3 SSB HD RH3 SSB GD mm in ...
Page 10: ...10 5 PTR1SSB xxxx PTR1 SSB01 10 mm in ...
Page 12: ...12 b Timing Chart For refrigerator and refrigerator side of Dual Temp models ...
Page 16: ...16 b Timing Chart For freezer except freezer side of RFH1 SSB HD auxiliary code P6 and later ...
Page 18: ...18 b Timing Chart For freezer side of RFH1 SSB HD ...