14
6. WATER VALVE
1) Disconnect the power source.
2) Close the water supply tap.
3) Disconnect the Inlet Hose from the Water Valve.
4) Remove the Mesh Filter from the Water Valve.
5) Clean the Mesh using a brush.
6) Replace the Mesh and Inlet Hose in their correct positions.
7) Open the water supply tap.
8) Connect the power source.
9) Check for leaks.
Summary of Contents for FM-300AFE-HC
Page 7: ...3 2 DIMENSIONS CONNECTIONS a FM 481AGE HC FM 481AGE HCN ...
Page 8: ...4 b FM 300AFE HC FM 300AFE HCN ...
Page 9: ...5 3 SPECIFICATIONS a FM 481AGE HC ...
Page 10: ...6 b FM 481AGE HCN ...
Page 11: ...7 c FM 300AFE HC ...
Page 12: ...8 d FM 300AFE HCN ...
Page 14: ...10 Drier Ice Chute Pressure Switch ...
Page 23: ...19 b FM 300AFE HC FM 300AFE HCN Pressure Switch Cut out 22 6 1 5 0 bar Cut in 15 7 1 5 bar ...
Page 24: ...20 2 WIRING DIAGRAM a WIRING DIAGRAM FM 481AGE HC FM 481AGE HCN ...
Page 25: ...21 FM 300AFE HC FM 300AFE HCN ...
Page 26: ...22 b CONTROL BOX LAYOUT FM 481AGE HC FM 481AGE HCN ...
Page 27: ...23 FM 300AFE HC FM 300AFE HCN ...
Page 35: ...31 FM 300AFE HC FM 300AFE HCN ...
Page 36: ...32 ...
Page 37: ...33 c SEQUENCE FM 481AGE HC FM 481AGE HCN 1 Startup Water Supply ...
Page 39: ...35 FM 481AGE HC FM 481AGE HCN 3 Startup Ice production starts ...
Page 40: ...36 FM 481AGE HC FM 481AGE HCN 4 Normal Operation Bin Control ...
Page 41: ...37 FM 481AGE HC FM 481AGE HCN 5 Shutdown Compressor stops 5 min ...
Page 42: ...38 FM 481AGE HC FM 481AGE HCN 6 Shutdown Drain ...
Page 43: ...39 FM 300AFE HC FM 300AFE HCN 1 Startup Water Supply ...
Page 45: ...41 FM 300AFE HC FM 300AFE HCN 3 Startup Ice production starts ...
Page 46: ...42 FM 300AFE HC FM 300AFE HCN 4 Normal Operation Bin Control ...
Page 47: ...43 FM 300AFE HC FM 300AFE HCN 5 Shutdown Compressor stops 5 min ...
Page 48: ...44 FM 300AFE HC FM 300AFE HCN 6 Shutdown Drain ...