
Pneumatics - hose
arrangement
The outflows on the distributors are allocated to
the individual outlets on the seed bar through
numbering.
NOTE
Uniform seed placement can only be ensured
when the seed transport to the coulters is
working.
¾
Observe correct hose installation.
Arrangement of hose routing depending on the
equipment used:
Express 4 KR
Tram line valves
Track width
Tram line valves
(Coulter No.)
1.46 m
9, 10, 19, 20
1.74 m
8, 9, 20, 21
2.04
7, 8, 21, 22
NOTE
¾
No tram line valves may be installed on the
distributor outputs 1,7,8 and 14.
1
2
3
4
5
15 16 17 18 19
27 28
13
14
Direction of travel
Distributor
Output
Distributor No.
Coulter No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15 16 17 18 19 20 21 22 23 24 25 26 27 28
1
2
3
4
5
6
7
8
9
10
11
12
13
14
14 13 12 11 10 8 7 9 6 5 4 3 2 1
9
13 12 11 8 10
5 6 7 4 3 2 1 14
MF
63