4
5
UnpacKinG
Unpack the product where you will be using it. Place the elliptical carton on a level flat
surface. It is recommended that you place a protective covering on your floor. Never
open box when it is on its side.
NOTE: during each assembly step, ensure that ALL nuts and bolts are in place and
partially threaded in before completely tightening any ONE bolt.
NOTE: A light application of grease may aid in the installation of hardware. Any grease,
such as lithium bike grease is recommended.
If you have questions or if
there are any missing parts,
contact Customer Tech
Support.
neeD Help?
pre
ASSEMBLY
toolS inclUDeD:
8 mm L-Wrench
5 mm L-Wrench (w/ Screw driver)
13/15 mm Flat Wrench
partS inclUDeD:
1 Main Frame
1 Stabilizer Tube
1 guide Rail Set
2 Pedal Arms
2 Lower Handlebars
2 Upper Handlebars
2 Lower Link Arms With Footpads
1 Top Cap
1 Console Mast
1 Console Mast Boot
1 Console
2 Handlebar Caps
1 Water Bottle Holder
1 Rear Cover
1 Power Cord
1 Hardware Kit
2 Handlebar Covers
UPPER HANDLEBAR
PULSE GRIPS
WATER BOTTLE HOLDER
TOP CAP
MAIN FRAME
PIVOTING FOOT PADS
REAR COVER
CONSOLE
CONSOLE CONTROLS AND
DISPLAY WINDOWS
CONSOLE MAST
LOWER HANDLEBAR
CRANK
PEDAL ARM
POWER CORD SOCKET
STABILIZER TUBE
LOWER LINK ARM
GUIDE RAIL SET