background image

ST699 ELECTRONIC DUAL ZONE TIMER

3

EN0R 8439 R0

ROOM

THERMOSTAT

BOILER

PUMP

CLOCK

ST699

FUSE

WIRING

Cable entries can be made through the opening in the rear of
the subbase, or via the three surface entry break-outs in the
top and two sides of the wallplate.  See fig. 2

The ST699 is designed for fixed wiring only and must be
wired in accordance with the latest IEE wiring regulations.

Ensure the wiring connections to the mains supply is via a
fuse rated at not more than 3 A and a Class "A" switch
(having contact separation of at least 3 mm in all poles).

Remove the terminal cover to allow access to the wiring
terminals as shown in fig.2. Connect the systems wiring as
shown by the specific applications wiring diagram.  A
maximum of two 2.5 mm

2

 (cross sectional area) wires can be

connected to each terminal as shown in fig.3. Each wire
should be stripped of insulation to a length no greater than
7mm to safeguard against the possibility of electrical shorts.

Fig. 2

*A link must be provided between L-5-8 on the subbase of
ST699 for all Sundial Plans, or fully controlled pumped
primary systems

Fig. 3

Basic System 3 - as System 2 except boiler cycling
controlled by room thermostat when DHW is switched
OFF

Systems Wiring

DHW OFF

DHW ON

CLOCK

Basic Wiring

CH OFF

CH ON

ST699

CLOCK

Basic System 1 - without thermostats

BOILER

PUMP

ST699

CLOCK

ROOM

THERMOSTAT

BOILER

PUMP

Basic System 2 - with room thermostat

ST699

Summary of Contents for ST699

Page 1: ...one timer on the market ST699 is designed for European CEN approval FEATURES 24 hour programme Independent heating and hot water channels One or Two ON OFF periods per day Built in programme Temporary programme override advance 7 day battery back up Compact size AM PM or 24 hour clock format factory option Wallplate compatibility with 7 day version ST799 10 minute programme resolution 3 A resistiv...

Page 2: ...ackup following a 24 hour charging period Switch rating 2 x SPDT potential free 3 A resistive 230 V 10 50 Hz 3 A inductive 0 6 pf Programme 24 hour with two ON OFF periods daily Programme resolution 10 minutes Programme day 03 00 AM to 02 50 AM on the next day Override Advance next programme time change Wiring Surface or single wallbox UA1 size Wiring access Rear or bottom edge surface wiring acce...

Page 3: ...A maximum of two 2 5 mm2 cross sectional area wires can be connected to each terminal as shown in fig 3 Each wire should be stripped of insulation to a length no greater than 7mm to safeguard against the possibility of electrical shorts Fig 2 A link must be provided between L 5 8 on the subbase of ST699 for all Sundial Plans or fully controlled pumped primary systems Fig 3 Basic System 3 as System...

Page 4: ...s firmly secured by the three securing clips Switch on the power and refer to the user s guide for programming details If the display remains blank press the RESET button with a blunt object e g a pencil C Plan ROOM STAT CYLINDER STAT MID POSITION VALVE BOILER PUMP CLOCK 3 A max ST699 Y Plan ST699 W Plan T6360 T4360 ROOM STAT L641 CYLINDER STAT V4044 DIVERTING VALVE BOILER PUMP CLOCK 3 A max ST699...

Page 5: ...ut our full range of Heating Products Central Heating Controls Honeywell Heating Controls Danfoss Heating Controls Radiator Valves Fernox Sentinel Magnaclean Warmup underfloor heating Water Heaters Hand Dryers ...

Reviews: