background image

SOUNDER

 

INSTALLATION

 

 
 
 
 
 
 
 
 
 
 
 
 

 

1.

 

Fasten

 

the

 

sounder

 

to

 

the

 

wall.

 

2.

 

Insert

 

the

 

connection

 

cables

 

through

 

the

 

holes

 

located

 

on

 

the

 

base.

 

3.

 

If

 

required,

 

modify

 

the

 

default

 

settings

 

by

 

adjusting

 

the

 

dip

 

switches

 

as

 

indicated

 

in

 

the

 

charts

 

above.

 

4.

 

Connect

 

the

 

power

 

supply

 

to

 

the

 

control

 

panel.

 

5.

 

Close

 

the

 

internal

 

and

 

external

 

covers

 

with

 

the

 

screws

 

provided.

 

 

WARNING:

 

The

 

power

 

supply

 

must

 

be

 

of

 

SELV

 

type.

 

 

Note:

  

to

 

avoid

 

formation

 

of

 

condensation

 

inside

 

the

 

sounder,

 

any

 

air

 

flow

 

must

 

be

 

avoided.

 

Once

 

the

 

cables

 

have

 

been

 

connected,

 

seal

 

the

 

hole

 

using

 

some

 

silicone.

 

This

 

operation

 

will

 

prevent

 

the

 

warm

 

and

 

humid

 

air

 

of

 

the

 

building

 

from

 

forming

 

condensation

 

inside

 

the

 

sounder

 

during

 

winter

 

time,

 

thus

 

avoiding

 

the

 

risk

 

of

 

malfunctioning.

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

FI

X

IN

G

 

HO

LES

 

Summary of Contents for Notifier DSE1-PW

Page 1: ... degree IP 44 Environmental degree IV outdoor Operating temperature from 25 to 55 C Timing Programmable see chart Command from the control panel Polarity inversion Size 330x210x115 H x L x D Weight 2 300 gr Standards EN 54 3 2001 A1 2002 A2 2006 DSE1 PW sounder description remote supplied 24Vdc sounder with high brightness low consumption LED flashing unit programmable alarms and timings flash and...

Page 2: ...control panel to each terminal B SIX WIRE CONNECTION Connect the lines output to each terminal EOL GND 0V 24V CONTROL PANEL STAND BY ALARM 24V GND 0V GND 0V 24V SOUND 2 CONTROL PANEL EOL SOUND 1 STAND BY ALARM 24V GND 0V EOL EOL SOUND 3 GND 0V 24V GND V0 24V 24V GND 0V 24V GND 0V ...

Page 3: ...LYING TO EN54 3 OFF ON 8 MINUTES NOT COMPLYING TO EN54 3 ON ON 15 MINUTES NOT COMPLYING TO EN54 3 CHART 5 LED FLASHING UNIT DIP4 LEDs MODE OFF STEADY ON ON FLASHING CHART 4 FLASHING SELECTION DIP 3 FLASH CONTROL OFF FLASH CONTROLLED BY ALARM INPUTS ON FLASH CONTROLLED BY M9 TEST INPUT CHART 6 AVERAGE CURRENT SELECTION ONLY SOUND Average Peak mA With FLASHING add 80mA to the value on the chart DIP ...

Page 4: ...82 105 84 102 50 106 76 95 90 Note When Synchronism is used the same Alarm Timing and Sound pattern Selection in every sounder connected must be used DSE1 PW vertical DIP 5 OFF 6 OFF 7 OFF DIP 5 ON 6 OFF 7 OFF 100mA 100mA S1 S2 S3 S1 S2 S3 min dB A 1m min dB A 1m min dB A 1m min dB A 1m min dB A 1m min dB A 1m 15 92 54 96 12 93 56 87 40 90 84 90 79 45 96 74 98 44 95 44 86 84 95 24 88 14 75 99 91 1...

Page 5: ...ntrol panel 5 Close the internal and external covers with the screws provided WARNING The power supply must be of SELV type Note to avoid formation of condensation inside the sounder any air flow must be avoided Once the cables have been connected seal the hole using some silicone This operation will prevent the warm and humid air of the building from forming condensation inside the sounder during...

Page 6: ... and response delay temperature resistance Pass Durability of operational reliability humidity resistance Pass Durability of operational reliability shock and vibration resistance Pass Durability of operational reliability corrosion resistance Pass Durability of operational reliability electrical stability Pass Durability of operational reliability resistance to ingress Pass ATTENTION Please note ...

Reviews: