Chapter 5 - Building ControlNet Trunk Cables
11. Make sure the center conductor is 4.0 mm (0.157 in.) in length and clean/free of any insulation
residue. For PVC cable, use the imprint guide on the back of the ControlNet tap or the strip gauge
to verify this. For FEP cable, use the small end of the calibration tool to verify this.
l
If the center conductor is too
long, cut off the excess with wire cutters.
l
If the center conductor is too
short, repeat the entire cable-stripping process.
- 35 -