Page 4-1
28 Feb 2018
23-15-45
SYSTEM DESCRIPTION, INSTALLATION, AND MAINTENANCE MANUAL
Aspire-200
© Honeywell International Inc. Do not copy without express permission of Honeywell.
INSTALLATION
1. Installation Overview
The Aspire system includes five LRUs:
•
HDU
•
IPLD
•
SCM
•
Antenna—LGA, IGA, or HGA
•
Optional router.
The first four LRUs of the core Aspire system provide all the functions and services described in “Aspire-200
Features” on page 2-7 and “Aspire-200 User Interfaces” on page 2-7. The router provides additional features
that can create a network or office for users in the aircraft cabin.
Figure 4-1 illustrates the LRUs and provides an overview of the major wiring routes. “Electrical Installation”
on page 4-10 provides details for connecting services to each LRU.
Figure 4-1 Installation Overview
2. Certification and Approvals
To install the AMT-1800 IGA, AMT-3500 IGA, AMT-700 or AMT-3800 HGA, or Blade LGA, you must obtain
the approval of the appropriate government air/radio authority, such as the FAA, EASA, or Transport Canada.
Contact the authorities when you begin planning your communication system in order to minimize approval
and certification issues.