
Chapter 8 High-speed Link
4
Pnet I/F Module 2MLL-PSRA, 2MLL-PMEA, 2MLL-PMEB User
’s Guide R220
Honeywell
January 2019
8.4 High Speed Link Parameter Setting
High-speed link parameter setting is set in High-speed link screen in SoftMaster. Refer to Chapter 8.3
about setting order.
1) Execution of SoftMaster
If SoftMaster is executed firstly, the menu is as shown below.
[Figure 8.4.1] Basic screen of SoftMaster
Items
Contents
Remark
Project name
Writing the project name in the SoftMaster software.
-
File location
Selecting the directory to save the project.
-
PLC Series
Selecting the PLC series (2MLK, ML50, 2MLI, 2MLR)
-
CPU type
2MLK
2MLK- CPUH, CPUS
-
ML50
ML50- MLIE, MLCH, MLM, MLIH, MLIS, MLIU
2MLI
2MLI-CPUH, CPUS, CPUS/P, CPUU
2MLR 2MLR-CPUH/F, CPUH/S, CPUH/T
Project description Writing the comment about the project.
-