
Chapter 5 Communication Program
2
Pnet I/F Module 2MLL-PSRA, 2MLL-PMEA, 2MLL-PMEB User
’s Guide
R240
Honeywell
January 2019
5.2 SoftMaster pragram
In order to use Pnet I/F module, set High-speed link parameters (after SyCon/N Configurator Configuration is
uploaded) and then download the specified parameters onto CPU for application, which is available through
the SoftMaster.
5.2.1 Setting PLC type
To connect the SoftMaster to the PLC, you have to set the PLC type. Create the new project by selecting
[File]
[New File]. On the new project menu, input the project name, project type and PLC type as shown
below
[Fig. 5.2.1] is initial screen of the SoftMaster
[Figure 5.2.1] initial screen of the SoftMaster