1
INSTALLING MOWER
Lift
Arms Fasten
to
Mower Deck
LOADER
SUB FRAME
MOWER DECK STOP
24
Fastening Lift Arms to Mower Deck
Screw the eye bolt into the lift eye and adjust to
137
mm
(5.4
in) length.
2.
Attach the eye bolt to the mower brackets with a
,
clevis pin and secure it with a linchpin.
3.
Pull down lift arm and align the oval hole of the
lift joint in the clevis of the lift arm, insert a clevis
pin and secure
it
with a linchpin.
4.
Raise the mower slowly with the hydraulic
position control to check for full travel with no
interference.
5.
Adjust lift joints so gauge wheels lift off the
ground at the same time.
Checking Mower Lift With Loader Sub-Frame
Installed
If
you have a front loader sub
frame installed, you must use the following
procedure to adjust the mower linkage
to
avoid damage
to the deck
or
linkage.
1.
Slowly move the Lift Selector Lever to the "UP"
position to raise the deck. Immediately lower the
deck at the first indication of resistance.
2. Check the clearance between the deck stops
and the front loader sub frame. Adjust the
clearance to 5 mm (0.20 in) by adjusting the left
lift
rod length (shortening the
lift
rod raises the
deck).
The
fully
raised position of the deck will be lower
than normal with the loader sub frame installed.
You will only be able to raise the deck to a maxi-
mum cutting height of
4
in.