71
Handing Length(Yt)
Supplide pipe Length-1000mm
Shaft length:Pipe length(Lt)+Handing length(Yt)-130mm
Handling Length(Yt)
Draw line mark
Draw line mark
Handle with care
Pipe length(Lt)+Stroke-130mm
㻌
㻌
ͤ
Please refer to operation manual supplied with auto hull unit for auto hull unit.
㻌
1. Cut off Upper/Lower shafts according to pipe length Lt and remaining length Yt.
Shaft Length : Pipe Length (Lt) + Hand
䡈
ing Length (Yt)
䇵
130mm
Standard Length : 1000mm
2. Put the marking at lowest position of Upper/Lower shaft
(excluding the remaining length).
Marking Position : Pipe Length (Lt) + Stroke – 130mm
㻌
㻌
㻌
㻌
㻌
㻌
3. Let Tx/Rx cable through Upper/Lower shaft.
HULL UNIT INSTALLATION