8
www.homewerksww.com
2
INSTALLING LED LIGHT KIT AND GLASS GLOBE
2. Choose which finial finish suits your application.
Place rubber spacer (BB) on the LED light kit
threaded rod. Then place the glass globe on to
the rod. Finally place the chosen finial on the
rod and tighten into place with the matching
finial nut.
Hardware Used
BB
Rubber spacer
x 1
NOTE:
Glass globe should not be mounted less
than 2.0 cm from the ceiling board.
Installing the fan body in an existing building
REQUIRES AN ACCESSIBLE AREA
(attic or
crawl space) above the planned installation
location and existing duct and wiring.
BEFORE INSTALLATION
Turn off power source. Review all safety precautions.
1. Remove existing fan.
2. Measure the opening to ensure it is large
enough to accommodate the new fan housing
(7-1/2 in. x 7-1/4 in.).
EXISTING CONSTRUCTION ASSEMBLY INSTRUCTIONS
2
1
BB