29
Day Override
This is the setting that determines the minimum frequency of backwash (measured in days).
For softeners used on city water supplies, this parameter is normally set at 14 days. For
softeners operated on a private well or surface water supply, this setting is usually set at 7
days.
To adjust the time of day override, touch “day override” and two blue arrows will appear.
Touch the arrows on the left or right to adjust the setting.
Regeneration Time
The “regen. time” is the time of day that the automatic regeneration cycle is scheduled to
occur. We recommend that the regeneration be carried out in the middle of the night or
other time where it is unlikely that water will be used for other purposes.
To adjust the time of day that the regeneration cycles will occur, touch “regen. time” and two
blue arrows will appear. Touch the arrow on the left to adjust to an earlier time, and the
arrow on the right to adjust to a later time.
Hardness
This parameter should be set at the level of your raw (untreated) hardness from your most
recent water test, in grains per gallon (GPG), adjusted for iron and manganese content.
We recommend that you determine this setting as follows: