4. Warranty

 

Our warranty only covers pumps which are installed and 
operated in accordance with these installation and opera-
tion instructions and accepted codes of good practice  
and being used for the applications mentioned in these  
instructions. 

 

5. Transport and Storage

 

The pump station may be transported and stored in 

vertical position. Make sure that it cannot roll or fall over. 
For longer periods of storage, the pump should be pro-
tected against moisture, frost or heat. 
 

6. Electrical Connection 

6.1. General instructions 

Before operation, an expert check must secure that 

the required electrical protection measures exist. The 
connection to ground, earthing, isolating transformer, fault 
current breaker or fault voltags circuit must correspond to 
the guidelines set forth by the responsible power plant. 

The voltage required in the technical data sheet 

must correspond to the existing line voltage. 

Make sure that the electrical pin-and-socket connec-

tions are installed flood- and moisture-safe. Before start-
ing operation check the cable and the plug against dam-
ages. 

The end of the pump power supply cable must not be 

submerged in order to prevent water from penetrating 
through the cable into the motor. 
 
The electrical connection of the pump should be carried 
out in accordance with local requirements. 
The operating voltage and frequency are marked on the 
pump and controller nameplates. Voltage tolerance : +6% 
up to -10% of the voltage stated on the nameplates. Make 
sure that the pumps of the pump station are suitable for 
the electricity supply available at the installation site. 
The pump motors have a thermal switch incorporated in 
the motor windings. The thermal switch protects the motor 
from overheating by cutting off the supply to the pump via 
the controller. 
The electrical connection must be carried out in accor-
dance with the marking on the cable to the controller. 
The lifting stations require no additional motor protection. 
 
6.3. Check of Direction of Rotation 
1 Ph-pumps do not require any check, as 
they always run with the correct direction 
of rotation. 
 
If the direction of rotation is wrong, inter-
change two of the phases of the electric 
power supply. Using an original HOMA 
control box with CEE-plug, this may be 
done by a 180° turning of the small round 
pole-socket at the plug-end with a 
screwdriver. 

 
7. Installation 

7.1. Installation Place 

Please pay attention to the local regulations for con-

structions and authorisations. 

Please pay attention to the regulations for lifting 

 gears and manhole. 

All underground, concret and mason's work should be 

done by an expert. 
 
Choose the installation place by taking into account the 
local regulations und the following points: 

 Existing supply and disposal installations must be easy 

accessable. 

 Never install the pump station close to windows and 

doors. 

 Make sure that the inlet pipes have enough natural fall. 

 The pump station correspond to class A (50 kN). 

 
7.2. Protection against lifting 
Under normal conditions the pump station is carry out for 
a ground water level of one meter below the pit surface 
without lifting. Is the ground water level higher then one 
meter there is the possibility to protect the pump station 
against lifting as follows: 
Place the pump station in the green concrete of the granu-
lar subbase. 
Fill up the pump station with water an fill up the excava-
tion with concrete. 
Fill up the tank bottom with concrete.  
 

8. Start-Up 

Never let the pump run dry for a long time of period, 

as it will destroy the pump (danger of overheating). 
Before starting the pump station make sure that all isolat-
ing valves are open and check that the unit runs satisfac-
torily.  
Make sure that the correct phase sequence was proofed 
at the 3-ph models (see 6.3.). 
Turn the operation switch inti the position "Auto". 
In combination with the pneumatic level control the pump 
starts aud stops according to the liquid level in the tank. 
 

9. Maintenance and Repair 

In case of a defect of the pump, a repair shall be car-

ried out only by the manufacturer or through an authorized 
workshop. Modifications of the pump must be confirmed 
by the manufacturer. Only HOMA spare parts shall be 
used. 

In accordance with the product liability law we point 

out that we shall not be liable for damages caused by our 
product due to unauthorized repair by persons other than 
the manufacturer or an authorized workshop or due to the 
use of spare parts other than original HOMA parts. The 
same product liability limitations are valid for accessories. 

Before maintenance or repair disconnect the pump 

from the power supply to avoid accidental starting of the 
pump! 

Before maintenance or repair make sure that all rotat-

ing parts stand still! 

Before carrying out maintenance and service, the 

pump must be thoroughly flushed with clean water. Rinse 
the pump parts in clean water after dismanteling. 

At pump types with oil chamber an overpressure can 

escape with loosening of the oil chamber control screw. 
Screw only when pressure balance took place. 
 
Pumps running under normal operation conditions should 
be inspected at least once a year. If the pumped liquid is 
very muddy or sandy or if the pump is operating continu-
ously, the pump should be inspected every 1.000 operat-
ing hours. 

Summary of Contents for C 225 WA

Page 1: ...Montage und Bedienungsanleitung Installation and Operation Instruction Manual Montage en Bedrijfsinstrukties 01 2005 Baureihe Series Serie Saniquick II UF...

Page 2: ...halt Contents Inhoud Seite 3 Page 8 Pagina 12 Seite 17 Page 17 Pagina 17 Seite 20 Page 20 Pagina 20 DEUTSCH ENGLISH NEDERLANDS Bauma e Dimensions Afmetingen Ersatzteilliste Spare part list Onderdelenl...

Page 3: ...lar f r Ersatzteile 18 14 Ersatzteilliste 20 1 Konformit tserkl rung EG Konformit tserkl rung im Sinne der EG Maschi nenrichtlinie 89 392 EWG Anhang II A Wir die HOMA Pumpenfabrik GmbH Industriestrass...

Page 4: ...nach dem Produkthaf tungsgesetz f r Sch den die durch unser Ger t verur sacht werden wenn die Hinweise und Vorschriften aus dieser Bedienungsanleitung nicht eingehalten werden nicht haften F r Zubeh...

Page 5: ...e der Phasenfolge nicht notwendig da diese immer mit der korrekten Drehrichtung laufen Bei Drehstromausf hrungen muss vor Inbetriebnahme der Pumpe die Drehrichtung wie folgt gepr ft werden Pumpe leich...

Page 6: ...us der lsperrkammer entweichen Schraube erst dann v llig herausschrauben wenn Druckausgleich erfolgt ist Die Pumpe sollte bei normalem Betrieb mindestens ein mal j hrlich berpr ft werden Bei Dauerbetr...

Page 7: ...Renner Stra e 76 Akazienweg 16 01796 Pirna 68809 Neulussheim 0 35 01 52 34 48 0 62 05 3 11 12 PAW Pumpen Aggregate GbR Giese Pumpentechnik Kleine Basch tzer Str 3 Belsemer Steg 14 02625 Bautzen 72131...

Page 8: ...Warranty Conditions and Warranty Receipt 11 12 Dimensions 17 13 Order Sheet for Spare Parts 18 14 Spare Part List 20 1 Declaration of Conformity EC Declaration of conformity in line with the EC Ma chi...

Page 9: ...es caused by the pump due to non observance of the instructions and guidelines set forth in the operating instructions The same product liability are valid for accessories 3 Applications and Technical...

Page 10: ...ars and manhole All underground concret and mason s work should be done by an expert Choose the installation place by taking into account the local regulations und the following points Existing supply...

Page 11: ...he fill in warranty receipt together with the purchase receipt Our warranty extends only the removal of material defects or production defects Costs for removal and installation of the com plained pro...

Page 12: ...derhoud en Service 15 10 Garantiebepalingen en garantiebewijs 16 12 Bouwmaten 17 13 Bestelformulier voor onderdelen 19 14 Onderdelenlijst 20 1 Conformiteitsverklaring EG Conformiteitsverklaring Volgen...

Page 13: ...dienen in acht genomen te worden Wij wijzen erop dat wij volgens de product aansprakelijkheidswet niet aansprakelijk zijn voor schade welke door onze machines veroorzaakt worden wanneer de aanwijzinge...

Page 14: ...n Als de aanduiding voor verkeerde draairichting op de schakelkast oplicht zijn 2 fasen van de netaansluitng verwisseld Bij installaties met CEE stekker kan de faseverwisseling door 180 draaien van de...

Page 15: ...nt u er rekening mee te houden dat zich in de oliekamer druk kan hebben opgebouwd Verwijder de schroef pas nadat de druk volledig weg is Voor aanvang van de arbeid wachten tot alle roterende delen sti...

Page 16: ...ring een strenge technische eindcontrole Mocht het apparaat desondanks reden tot een gerechtvaardige garantieclaim geven dan heeft u recht op een aansprekende kostenloze afwerking Garantiereparaties m...

Page 17: ...Nr Bezeichnung Menge Lieferanschrift Unterschrift Firmenstempel 13 Order Sheet for Spare Parts To HOMA Pumpenfabrik GmbH D 53819 Neunkirchen Seelscheid Fax 49 22 47 7 02 44 Pump type see pump label Ye...

Page 18: ...efoon 0183 622212 Fax 0183 620193 Pompentype Typeplaatje Bouwjaar Typeplaatje Gedetailleerde onderdelenlijst 1 Pos Nr Beschrijving Aantal 2 Pos Nr Beschrijving Aantal 3 Pos Nr Beschrijving Aantal 4 Po...

Page 19: ...Part description see hereafter Required quantity Pos Part description Pos Part description 1 01 Collecting tank 4 05 Elbow 1 02 Ground plate right 4 06 Four way piece 1 03 Ground plate left 4 07 High...

Page 20: ...20...

Reviews: