B U L L E T I N
G L V - 4 0 S 1 # 1 1 9 6 G E A R L E S S T R A C T I O N M A C H I N E
Page 3-3
Rev. A - 04/01/2022
Moisture, Condensation
Before installing the machine, and before any voltage is applied, check the machine for
condensation, or any evidence of moisture or water. If any evidence of wetness is found,
contact HWEC for drying instructions.
After the machine has been dried per factory instructions, it will be necessary to verify the
insulation between each coil phase and earth ground. Using an insulation tester (or
megohmmeter) check the insulation resistance at 500VDC.The resistance should be NO LESS
than100 Mohm.