ODP 40
4,000 Lb Drum Puller
- - 12 - -
© COPYRIGHT 2016 HOGG & DAVIS, INC
Rope Payout Procedure (Free
Wheel)
When beginning the rope payout feature, be sure that the
engine is turned off. Ensure that all tension is removed from the
pulling rope before attempting to remove drive pin.
Adjust reel brake to provide tension to the reel of rope.
Remove the drive pin from the sprocket drive and place in the
provided storage sleeve. Begin to pull rope through the blocks
while continuing to adjust the over spin brake. When the rope
install is completed, insert the drive pin the sprocket drive.
Manual rotation of the rope reel may be needed to properly
install drive pin.
Refer to the performance chart for proper hydraulic pressure as
it directly relates to conductor tension. This chart is located on
the control panel of the unit.
***These instructions assume that the operator has set the
proper drive pin for the reel to be pulled in. All other reels are
to be disengaged with the over spin brake fully applied.
Pulling Control
The following instructions explain how to properly set up the unit
when it is to be used as a puller and have a pulling rope with
NO TENSION. DO NOT FOLLOW THESE INSTRUCTIONS WHEN YOU
HAVE A ROPE UNDER TENSION!!
Summary of Contents for ODP 40
Page 3: ...ODP 40 4 000 Lb Drum Puller 3 COPYRIGHT 2016 HOGG DAVIS INC Product Warnings...
Page 6: ...ODP 40 4 000 Lb Drum Puller 6 COPYRIGHT 2016 HOGG DAVIS INC...
Page 11: ...ODP 40 4 000 Lb Drum Puller 11 COPYRIGHT 2016 HOGG DAVIS INC...
Page 19: ......
Page 20: ......
Page 21: ......
Page 22: ......
Page 23: ......
Page 24: ......
Page 25: ......
Page 33: ...8 1 97 1 16 16 6 1 2 198 5 16 Curbside View Page 2...
Page 53: ...Page 22...
Page 54: ...Page 23...
Page 55: ...Page 24...
Page 56: ...Page 25...
Page 57: ...Page 26...
Page 58: ...Page 27...
Page 59: ...Page 28...
Page 60: ...Page 29...