4
2
Connections
2.1
Electrical connection
Must be carried out by an authorized technician
according to the local and national codes.
–
The electrical supply shall comply with the name-plate data.
With voltage 400/50/3/N reduced booster loading can be
realised according to wiring diagram.
–
Line fuses and cable cross section shall comply with the
requirements.
–
A cut-off device shall be provided to connect the supply cord
(isolating switch or accessible plug device).
According to EN 60 335 the appliance must be connected to an
equipotential conductor. The connecting screw (
) is located
beside the cable inlet.
1
Installation
1.1
Location
–
Rear wall clearance not required.
For corner installation lateral clearance of 107 mm is required.
For free-standing installation the optional rear panel has
to be installed.
–
Level machine by turning the feet.
–
Distribute machine weight equally onto all feet.
1.2
Converting to corner operation
Depending on direction of operation, one of the rack guides may
need to be adjusted to suit the direction of operation (see arrow).
–
Unscrew the guide rail in front.
–
Remount guide rail at right angle according to the direction of
operation.