building!
Only persons holding necessary licences, knowledge, skills and equipment can be trusted with
assembly of the boiler.
The installation must satisfy all standards and rules in force and the principles of construction craft.
The boiler can only be operated when both the boiler and the heating installation are in perfect state
of repair. Breaks, defects and disturbances in operation must be immediately reported to the relevant
authorities.
Before launch and then regularly every six months, check if the heating system contains enough
water.
Never open the inspection openings when the boiler is working as this may release dust and exhaust
that next can ignite and explode,
Never attempt any repairs or reassembly,
Never remove the covers as movable pieces and electric devices are installed behind.
Extinguish the boiler and wait till it cools down before start of any maintenance work with the
boiler.
At least once a month check the doors and the water inlets and outlets for tightness.
At least once a year check operation of the STB fuse.
Facilitate the boiler room with a sign prohibiting smoking and use of fire.
Ventilating system must be operable and satisfy all relevant requirements.
Operable extinguisher must be available in the boiler room.
The boiler room must be secured against entry of unauthorised persons, in particular children.
Never remove or disable any safety or measurement devices.
Use gloves, dust mask and overalls when clearing ash and cleaning the boiler.
The boiler must only be installed in the premises designated thereof and satisfying the applicable
requirements.
Extinguish the boiler when fuel is delivered.
If the temperature of tap water has been set up above 60ºC, warrant admixture of cold water as this
creates risk of burning injury.
Facilitate proper air removal off the boiler and the heating system.
Use only manufacturer's spare parts.