
4
2. Before Installation
2.1 Necessary Tools and Instrument List for Installation
No.
Tool
No.
Tool
1
Handsaw
12
Wrench
2
Phillips Screwdriver, Slotted Screwdriver
13
Scale
3
Vacuum Pump
14
Charging Cylinder
4
Refrigerant Gas Hose
15
Gauge Manifold
5
Megohmmeter
16
Wire Cutters
6
Copper Pipe Bender
17
Gas Leak Detector
7
Manual Water Pump (for Indoor Unit)
18
Leveller
8
Pliers
19
Crimper for Solderless Terminals
9
Pipe Cutter
20
Hoist (for Indoor Unit)
10
Brazing Kit
21
Ammeter
11
Hexagon Wrench
22
Voltage Meter
It is recommended to use specially designated tools for handling R410A refrigerant.