3 INSTALLATION
3.1 SELECTION OF INSTALLATION PLACE
Select a suitable place for handling and determine the installation place of the central station with the customer’s acceptance.
Do not install the central station in places which are at the reach of children or where the air from the air conditioner is directly
discharged.
Before installing the controller, prepare the following items.
Parts
6SHFL¿FDWLRQ
Switch Box
JIS switch box for 2 switches (with cover) (JIS C 8340)
Power Supply Cable
&DEOHVSHFL¿FDWLRQWRPP
2
Recommended cable: 600V CV, CCV, CEV
H-LINK Cable (For control)
&DEOH63(&WRPP
2
Recommended cable: JKEPV-S, JKEV-S, CVV-S, CVV, 600V VCT
* The recommended cables are the model name of Hitachi Cable, Ltd.
3.2 COMPONENTS LIST
Unpack the unit and check that:
The package contains all the components (see next table).
All components are in perfect condition.
Otherwise, contact the manufacturer.
Name
4XDQWLW\
&RPPHQWV
Central station PSC-A32MN
運転/停止 電源
1
For controlling system operation
M4x16L screws
4
)RU¿[LQJWKHFHQWUDOVWDWLRQ
Touch pen
2
For activating/deactivating the touch options on the screen.
Touch pen holder
1
For holding the touch pen on the central station.
USB stick memory
1
With the detailed Installation and operation manual
Instruction manual
1
Basic instructions for the installation of the device.
Connector Cord
3
For using external input/output functions (CN1~3).
Closed End Connector
9
For closing the wire end of the connection cord.
Nylon Band
3
)RU¿[LQJWKHFDEOHV
ENGLISH
Installation
PMML0332A rev.0 - 05/2015
3
Summary of Contents for PSC-A32MN
Page 2: ......