(5)
Q1E-EP0415
CONTENTS
Page
1.
Introduction ················································· 1
1.1.
Features ··················································· 1
1.2.
Principles of operation ···································· 1
1.3.
Intended Use ··············································· 1
1.4.
Components ················································· 2
1.5.
External View ·············································· 2
2.
Inspection before Use ········································ 3
2.1.
Inspection for Appropriate Connection ······················ 3
2.2.
Inspection for Material Surface ···························· 3
3.
Operation Procedure ·········································· 4
4.
Cleaning, Disinfection and Sterilization ····················· 5
4.1.
Point of use (Pre-cleaning) ································ 6
4.2.
Containment and transportation ····························· 6
4.3.
Manual Cleaning and disinfection ··························· 7
4.4.
Drying ····················································· 8
4.5.
Inspection ················································· 8
4.6.
Packaging ·················································· 9
4.7.
Sterilization ·············································· 9
4.8.
Storage ··················································· 11
5.
Maintenance and Safety Inspection ··························· 11
6.
Safety Precautions ·········································· 11
7.
Specifications ·············································· 12
7.1.
Probe ····················································· 12
7.2.
Suppliers List ············································ 13
8.
Disposal of the probe ······································· 13