
30
CP-S335(C9SM)/CP-X340, PJ552 (C9X)/CP-X345, PJ562 (C9XM)
7. Wiring diagram
Wiring diagram 1 (C9SM/C9X/C9XM)
Wiring ballast power source board
(1) Connect CNBAR.
(2) Install FEB2.
(3) Wire CNBAR and #6800.
Wiring the circuit power source/ballast power source boards, and the control main board (When assembling board sub-assembly)
Wiring circuit power source board
(1) Connect TSW .
(2) Connect CNPOW.
(3) Connect CNPWR, and install FEB1.
Confirm that CN102 and CN103 are securely connected.
(This
cannot
be
confirmed
downstream.)
CN101
CN102
CN103
Completely lock when connecting
CNPWR connector to CN101.
CNPOW
CNPWR
FEB1
TSW
Install FEB1 (ferrite core) to CNPWR.
Completely lock the tabs when installing FEB1.
As shown in the drawing below, secure to CNPWR with Z1
(tie band). (Always cut off Z1 extra length, leaving 2~3mm.)
Z1
The bending length shall be
55±5mm.
FEB1
Outside air temperature sensor
#6800
CNBAR
Follow there instructions to keep
adequate distance for insulation
between the primary and the
secondary side.
•Route #6800 and CNBAR
through the cutaway hole
in the sheet before installing
ballast. (Routing under the
sheet is difficult after installing
the ballast power source.)
•Lay #6800 and CNBAR to
eliminate sag.
•Route #6800 and CNBAR
between the sheet and case,
through the fastener, and lock
them.
Fastener
* The FEB2 style shall be as shown below.
* Orient the FEB2 protrusion inward.
* Keep the lamp lead extra length to a minimum.
FEB2
FEB2
Confirm that CNBAR is securely
connected to CN2.
(This cannot be confirmed downstream.)
CN2
WARNING
Confirm that the
TSW is printed
with YS11A120A-**.
WARNING
WARNING
Instractions in this chapter are based on the standards
and/or the laws. Deviation from instructions could be
against the standards and/or the laws. Always put
together according to these instructions.
WARNING
Summary of Contents for CP-S335W
Page 46: ...THE UPDATED PARTS LIST FOR THIS MODEL IS AVAILABLE ON ESTA ...
Page 59: ...58 CP S335 C9SM CP X340 PJ552 C9X CP X345 PJ562 C9XM MEMO ...
Page 61: ......
Page 62: ...A B C D E F G 5 4 3 2 1 6 6 5 4 3 2 1 PWB assembly CONTROL C9SM C9X C9XM ...
Page 63: ...A B C D E F G 5 4 3 2 1 6 6 5 4 3 2 1 PWB assembly MAIN 1 C9SM C9X C9XM ...
Page 64: ...A B C D E F G 5 4 3 2 1 6 6 5 4 3 2 1 PWB assembly MAIN 2 C9SM C9X C9XM ...
Page 65: ...A B C D E F G 5 4 3 2 1 6 6 5 4 3 2 1 PWB assembly MAIN 3 C9SM C9X C9XM ...
Page 66: ...A B C D E F G 5 4 3 2 1 6 6 5 4 3 2 1 PWB assembly MAIN 4 C9SM C9X C9XM ...
Page 67: ...A B C D E F G 5 4 3 2 1 6 6 5 4 3 2 1 PWB assembly MAIN 5 C9SM C9X C9XM ...
Page 71: ...A B C D E F G 5 4 3 2 1 6 6 5 4 3 2 1 PWB assembly MAIN 9 C9SM C9X C9XM ...
Page 72: ...A B C D E F G 5 4 3 2 1 6 6 5 4 3 2 1 PWB assembly MAIN 10 C9SM C9X C9XM ...
Page 73: ...A B C D E F G 5 4 3 2 1 6 6 5 4 3 2 1 PWB assembly MAIN 11 C9SM C9X C9XM ...