CHASSIS
- 300-
Oil Cooling System
INSTALLING OIL COOLING SYSTEM
1. To take a pressure resistance inspection to the
Oil Cooling System after maintain, the
pressure is 0.3MPA.
2. After take the pressure resistance inspection,
pass over 0.03MPA compressed air through
the connecting oil cooler, steel oil pipe and
Rubber Pipe for 3 minutes, do not leak.
3. According to the disassembly order, reverse
carries on the assembly.
4. When it is assemblied, pour the" L" engine oil,
then start the engine for 10 minutes to check
whether leaks. If it is not ,the Oil Cooling
System maintain is finish.
Summary of Contents for HS700UTV-4
Page 95: ...SPECIFICATIONS 82 HYDROGRAPHIC CHART Hydrographic chart Pressure splash...
Page 96: ...SPECIFICATIONS 83 LUBRICATION OIL WAY Hydrographic chart Pressure splashing oil...
Page 242: ...CHASSIS 229 No Part Name Qty Remarks 25 Dust seal 1 26 Caliper piston seal 1 27 Bleed screw 1...
Page 293: ...CHASSIS 280 No Part Name Qty Remarks 11 Cross large plate head screw M6 16 4 12 Nut clip M6 4...
Page 380: ......
Page 381: ......
Page 382: ......
Page 383: ......
Page 384: ......
Page 385: ......
Page 386: ......
Page 387: ......
Page 388: ......