
4.4 Installation procedure
25
4 Setting Up
Version 04 05/2014
4.4 Installation procedure
The Repeater OZD Profi 12M … PRO is installed by the
following steps:
䊳
Installing repeater
䊳
Setting compatibility, operating mode and
transmitting power
䊳
Connecting the optic bus cables
䊳
Connecting the electric bus cables
䊳
Connecting the function ground and the shield
of the bus cable
䊳
Connecting the signal contact lines (optional)
䊳
Connecting the analog voltage outputs (optional)
䊳
Connecting the operating voltage supply
䊳
Checking the LED indicators