Commissioning
4 Commissioning
This chapter contains information, advice and instructions for commissioning the device.
4.1 Switching device on and off
The load limiting device has no on/off switch. The console automatically switches on after
connecting the power supply and control voltage (ignition, terminal 15)
After boot-up the following appears on the display:
Device has been switched off
for longer than 2 hours
Device has been switched back on
within 2 hours:
Display after
boot-up:
Carry out SETUP procedure next!
(See chapter
)
If the crane configuration has not changed within
the last 2 hours, check displayed configurations.
If OK, confirm.
The SLI menu is then displayed.
© 2012 Hirschmann Automation and Control GmbH · Mobile Machine Control Solutions · www.hirschmann.com
17
/59
50-700-19-2001_422175_en (Manitex)_Rev_B.doc / 2012-03-13 / Issue B / rk.