30
BAT-F, BAT-Rail, BAT54, BAT300
Release 02 07/10
2
Assembly and start-up
2.1
Installing the device
The devices have been developed for practical application in a harsh
industrial environment.
On delivery, the device is ready for operation.
The following procedure has been proven to be successful for the assembly
of the device:
X
Unpacking and checking
X
Putting components together (BAT-F)
X
Selecting the location for mounting/setting up
X
Mounting outdoors (BAT-F)
X
DIN rail mounting (BAT-Rail)
X
Flat surface mounting
X
Mounting/connecting external antennas
X
Connecting LAN and WLAN connectors
X
Connecting the supply voltage
X
Grounding
X
Installing the data lines
X
Installing the housing cover BAT-F X2
X
Starting up
X
Finding and configuring devices
X
Installing external antennas
X
Establishing basic settings
Before installing and starting up the device, note the safety instructions (see
page 6
onwards).
2.2
Unpacking and checking
Check that the contents of the package are complete
(see page 62
„Scope of delivery“)
.
Check the individual parts for transport damage.