Himel ATSE2CM Operation Manual Download Page 8

 

 

 

Internal 

5.1、

Public parameters

 

No

 

Option

 

Definition

 

Default

 

Adjustment Range

 

1.1 

SYSTEM TIME 

\

 

\

 

Real time

 

1.2 

BACKLIGHT 

Min

 

Active

 

Active /1-30 Min

 

1.3 

BRIGHTNESS 
REGULATION 

Standby / work 

15/30

 

0-100/10-100

 

1.4 

PERMISSIONS

VALID TIME

 

Min

 

Active

 

Active /1-30 Min

 

1.5 

USER 

PASSWORD 

\

 

1000

 

0000-9999

 

 

5.2、

System parameters

 

No

 

Option

 

Definition

 

Default

 

Adjustment Range

 

2.1 

NETWORK 

Network Type

 

4NBL

 

4NBL

 

2.2 

NOM.VOLT. 

P-P Voltage

 

400 

50-690V 

2.3 

APP

 

M-M:Mains to Mains Supply 

M-M 

M-M 

2.4 

RETURNS 

Inhibit the automatic 

retransfer 

Automatc 
retransfer 

to the 

priority 
source 

Automatic retransfer 

to the priority source / 

Don’t automatic 

retransfer to the 

priority source   

2.5 

NOM.FREQ. 

Nominal network frequency 

50 Hz 

50/60Hz 

2.6 

POT PH. 

Select and verify Phase 

Sequence 

OFF 

L1L2L3/ L3L2L1/ OFF 

2.7 

1RT 

Source I Return Timer 

3S 

0-99S 

2.8 

1FT 

Source I Failure Timer 

3S 

0-99S 

2.9 

2RT 

Source II Return Timer 

3S 

0-99S 

2.10 

2FT 

Source II Failure Timer 

3S 

0-99S 

2.11 

UND.U 

Under-voltage threshold 

85% 

70-95% 

2.12 

UND.U.HYS 

Under-voltage hysteresis 

95% 

75-100% 

2.13 

OV.U 

Over-voltage threshold 

115% 

105-130% 

2.14 

OV.U.HYS 

Over-voltage hysteresis 

110% 

100-125% 

2.15 

UND.F 

Under- Frequency threshold 

95% 

80-99% 

2.16 

UND.F.HYS 

Under- Frequency hysteresis 

97% 

88-100% 

2.17 

OV.F 

Over- Frequency threshold 

105% 

101-120% 

2.18 

OV.F.HYS 

Over- Frequency hysteresis 

103% 

100-119% 

 

 

Summary of Contents for ATSE2CM

Page 1: ...Internal ATSECM Controller Operation Manual...

Page 2: ...r shunt release closing coil ATS Controller Do not install key lock with ACB it will damaged the ACB when automatic transfer Do not install the under voltage release with ACB It will impact ATS automa...

Page 3: ...Internal Default with 3m controller cable...

Page 4: ...y applied to power plant post and telecommunications petroleum coal metallurgical railway municipal intelligent building etc Functional parameter Graphic LCD 800x480 pixel 5 inch TFT Two source AC pow...

Page 5: ...000 Test mode Key Press this Key for 3 seconds to enter test function Auto mode Key Press this Key for 3 seconds to set controller as Auto mode Manual mode Key Press this Key for 3 seconds to set cont...

Page 6: ...age status LED Green S1 normal fixed S1 abnormal blinking S2 voltage status LED Green S2 normal fixed S2 abnormal blinking Qs1 switch status LED Green on Qs1 close off Qs1 open Qs2 switch status LED G...

Page 7: ...xecutes operation of open close switch and start stop generator When the time of exceeding limit of prior source is longer than the set delay time the device will open the load of the main source and...

Page 8: ...Automatic retransfer to the priority source Don t automatic retransfer to the priority source 2 5 NOM FREQ Nominal network frequency 50 Hz 50 60Hz 2 6 POT PH Select and verify Phase Sequence OFF L1L2L...

Page 9: ...bit input function Forced to pos 0 The transfer switch is immediately driven to 0 position and the controller in manu mode meantime when the input signal disappear the controller feedback to auto mode...

Page 10: ...hen controller in auto mode Position I The output signal is activated when ATS in position I Position II The output signal is activated when ATS in position II Position 0 The output signal is activate...

Page 11: ...ower supply status icon refer to pic1 page example Note Pic 1 Power supply status Data display icon refer to pic2 pic8 page example Note Pic2 Data display Phase voltage 220V Pic3 Data display Line vol...

Page 12: ...synchronous transfer Pic5 Data display Programmable input if there is signal detected in 01 input port then the 01 will be selected Pic6 Data display Programmable output if there is output action in 0...

Page 13: ...refer to pic9 page example Note Pic9 Alarm status Alarm status If there is A01 alarm A01 in the pic will be selected Commissioning icon refer to pic9 page example Note Pic10 Commissioning menu Simula...

Page 14: ...Internal Pic11 Event record Device Event record...

Page 15: ...wer supply terminal 2 L2 3 L3 4 N 5 L1 S2 AC 3 phase 4 wire voltage input L1 N are AC power supply terminal 6 L2 7 L3 8 N 17 COM Module grounding Module ground terminal 18 INPUT1 Break1 closure detect...

Page 16: ...xiliary power output port 10A 35 Relay NO 36 Relay NC 37 OUT8 Relay COM Genset start output port 10A 38 Relay NO 39 Relay NC 40 OUT7 Relay COM Programmable output port 10A 41 Relay NO 42 Relay NC 43 O...

Page 17: ...Internal 6 2 Terminal diagram ATSECM controller with air circuit breaker...

Page 18: ...tage 400VAC LL Operating limit value 90 415VAC LN Frequency 45 65Hz Power consumption 10W 2 DC supply terminal 29 30 Rated battery voltage 24VDC Operating limit value 10 30VDC Max power consumption 10...

Page 19: ...UT7 Contact Type single pole double throw Rated value DC 10A 30V AC 10A 250V 6 Output 43 OUT6 45 OUT5 46 OUT4 48 OUT3 49 OUT2 51 OUT1 Contact Type single pole single throw Rated value DC 10A 30V AC 10...

Reviews: