Updating Firmware
63/72
SmartWire-DT Gateway | EU5C-SWD-POWERLINK
DOC130802UM02EN | Revision 2 | English | 2013-12 | Released | Public
© Hilscher 2013
For information about how to use this tool, please refer to the operating
instruction manual
Ethernet Device Configuration,
which is stored on the
product DVD in the
Documentation\english\1.Software\Ethernet
Device Setup Utility
directory.
Note:
Before you can use the
Ethernet Device Configuration
Tool
to
assign a temporary IP address, you first have to perform a special reset
operation on the gateway, in order to deactivate the POWERLINK
connection. For this special reset, you must briefly disconnect the gateway
from the voltage supply and keep the
configuration button
pushed in for
two to three seconds while reconnecting the voltage supply. The
BS
and
BE
LEDs will automatically turn off after successful reset (for the positions
of the configuration button and the LEDs on the gateway, see section
Device Picture
on page 27).
After having set the temporary IP address and having updated the
firmware in the gateway via web browser and WebServer, you must
perform an ordinary reset of the gateway.