Have you thoroughly examined the case for shipping damage? (see pg. 7)
Have you checked the horizontal level of the case?
(see pg. 8)
Have you applied the sealant to the end breakers of adjoining cases?
(see pg. 9)
Have you sealed the case-to-case joints by applying caulk and acrylic tape to
the end frame seam? (see pg. 9)
Have you installed the toekick? (see pg. 9)
Have you checked that all T-8 light caps and holders are positively engaged?
(see pg. 10)
After powering-up the case, be certain that all of the steps listed below have
been completed to ensure proper case functionality, safety and compliance with
warranty terms.
1.
Check all lights and heating elements to ensure they are all functioning
properly.
2.
Check case temperature and adjust controller as needed.
Before powering-up the case, be certain that all of the steps listed below have
been completed to ensure proper case functionality, safety and compliance with
warranty terms.
TECHNICAL REFERENCE
PRE-POWER CHECKLIST
12
Summary of Contents for DELI
Page 2: ...ii ...
Page 5: ...Revision History new manual format_09 21 v ...
Page 23: ...A1 Wiring Information B1 Parts List APPENDIX ...
Page 24: ...A1 WIRING DIAGRAM TBD ...